4" drainage pipe installed under the plastic to keep the slab dry. The top of the slab is at the chalked line or the string.
Tuesday, January 15, 2008
under-slab drainage
4" drainage pipe installed under the plastic to keep the slab dry. The top of the slab is at the chalked line or the string.
Thursday, January 3, 2008
Subscribe to:
Posts (Atom)