Tuesday, February 12, 2008

Tube steel



Some tube steel to satisfy those California Building Codes

Floor joists


Wednesday, February 6, 2008

Down on the ranch




Framing begins


The crew from Hawkes Construction, (Larry, Dan and Chris) begin the framing.

The glulam goes up for the floor of the mezzanine.

And the cellar takes shape with some framing. That big doorway makes Larry look a little short.

Tuesday, January 15, 2008

under-slab drainage



4" drainage pipe installed under the plastic to keep the slab dry. The top of the slab is at the chalked line or the string.